kW Engineering Inc.

Ordway Building Chiller Optimization Study

A detailed chiller study to characterize load and optimize plant design.

focus on energy
focus on energy
border
about | home | services | clients | projects | psychrometrics | employment | contact

other projects
Previous Next
prev   next

Client: Prentiss Properties

Scope: Accurately estimate energy savings for a chiller and pumping retrofit project within a limited budget.

kW Engineering just completed a study to optimize chiller plant performance for the Ordway, a 515,000 square foot office building in downtown Oakland. Our engineers performed in-depth measurement including chilled water supply and return temperatures, condenser water temperatures, chiller true power, flow and other spot measurements. We paired detailed data collected during a period of intense plant instrumentation with trends from the site energy management system to project an annual load profile for the building. Our engineers then analyzed energy efficiency opportunities using the plant load data. We also provided the client with projected installation and operating costs for several chiller plant configurations including a new VFD chiller.

Energy Efficiency Measures Evaluated

  • High Efficiency Chillers
  • Variable Speed Chillers
  • Variable Flow Pumping
  • Improved Cooling Tower Control

Projected Savings

  • 421,000 kWh per year
  • 390 kW peak demand
  • $104,000 per year in operating costs
The Ordway